Project Example: Opus Sierra Point

5000 Shoreline Court
South San Francisco, CA 94080

General Contractor
Opus West Construction Corporation
Pleasanton, CA

Architect/Engineer
Greenberg Farrow, Spink

Project Description
Three Story Precast, 120,000 sq. ft.

Tru-Frame® Value Added:
This building site was placed over a previous dumpsite over San Francisco Bay mud therefore pile foundations were required. Using the Tru-Frame® system reduced the structure weight from 1250 tons (originally conventional moment frame) down to 850 tons, which had a dramatic effect of the pile requirements and structure costs.